• 01-4526483
  • info@chpl.com.np
About-Us

Welcome to Chhyangdi Hydropower Limited

Chhyangdi Hydropower Private Limited was incorporated as a private limited on 2064/05/16 BS  and later converted into the public’s company as Chhyangdi Hydropower Limited on 2071/03/30.

The main objective of the company is optimum use of water to generate hydropower electricity which ultimately fulfills the demand of electricity of the country optimum use of water resources to generate the hydro energy is the main objective.

Project Updates

Upper Chhandi Khola Small Hydropower Project 4Mw (Operation)

Upper Chhandi Khola Small Hydropower Project 4Mw (Operation)

Upper Chhandi Khola Small Hydropower Project (UCKSHP) is a Run-of-River type hydroelectricity

Chhandi Khola Small Hydropower Project 2Mw (Operation)

Chhandi Khola Small Hydropower Project 2Mw (Operation)

Chhandi Khola Small Hydropower Project is a run-of-river type hydropower scheme aimed

News

The main objective of the company is optimum use of water to generate hydropower electricity which ultimately fulfills the demand of electricity of the country optimum use of water resources to generate the hydro energy is the main objective.

Testimonials