Upper Chhandi Khola Small Hydropower Project(4 MW)
Upper Chhandi Khola Small Hydropower Project (UCKSHP) is a Run-of-River type hydroelectricity generation scheme with an installed capacity of 4.0 MW. The project is aimed at generation of 22.05 GWh average annual energy before 5% outage using design discharge of 0.67m3/s at Q40 off Chhandi Khola (a tributary of Dordi River) and net head of 712.15 m. The proposed project site is located in Bansar and Phaleni VDCs of Lamjung District in Western Development Region of Nepal within the geographical boundaries 280 16' 05" N to 280 17' 46" N latitude and 840 28' 38" to 840 29' 57" E longitude. The proposed headworks and powerhouse of the proposed Upper Chhandi Khola SHP is located on the right bank of Chhandi Khola at around 3 Km upstream (river stretch length) and at around 100 m upstream of the headworks site of existing Chhandi Khola Hydropower Project on the right bank of Chhandi Khola, respectively in Bansar VDC. The catchment area at intake of the Upper Chhandi Khola hydropower project is 13.51Km2.
Salient Features of the Upper Chhandi Khola Small Hydropower Project
|
||
Development Region | : | Western Region |
Zone | : | Gandaki |
District | : | Lamjung |
Geographical Co-ordinates | ||
Latitude | : | 28°16’04” N to 28°17’46” N |
Longitude | : | 84° 28' 38” E to 84° 29' 57” E |
|
||
Name of River | : | Chhandi Khola |
Nearest Town | : | Udipur, Lamjung |
Gross Head | : | 732.67m |
Net rated Head | : | 710.12m |
Installed Capacity | : | 4Mw |
|
||
Catchment Area | : | 13.51km² |
Mean Annual Discharge | : | 0.88 m3/s |
Design Discharge (at 41%PoE) | : | 0.67m3/s |
|
||
Type of Weir | : | Tyrolean Weir |
Length of Weir | : | 7 m |
|
||
Type of Intake | : | Bottom rack Intake |
Nos of Opening | : | 1 |
Size of Intake (W x H) | : | 1.0 m x 0.9 m (W X H) |
Flushing Channel | : | 0.30m width X 0.30 m depth |
|
||
Type | : | Rectangular channel |
Length | : | 10 m |
Size (W x B) | : | 1m X 2.4m |
|
||
Type | : | Dufour , intermittent flushing |
Dimension (L x B x H) | : | 30.0 m x 2.00 m x 1.8 m |
Inlet Transition Length | : | 2.20 m |
|
||
Type | : | Exposed, Stee pipe |
Internal Diameter | : | 0.9m |
Length | : | 2842.73m |
|
||
Type | : | Simple Steel Pipe surge tank |
Effective Depth | : | Inclined pipe of 70 m length |
Diameter (Or size) | : | 1 m |
|
||
Type | : | Exposed steel pipe |
Internal Diameter | : | 0.55 |
Length | : | 1316.16 m |
|
||
Type | : | Surface |
Size (L x W) | : | 19.85 m x 10.60 m |
|
||
Type | : | Squared (Box Canal) |
Tailrace Length | : | 83.5 m |
|
||
Type | : | Horizontal axis Pelton turbine |
Number | : | 2 |
Rated Output Capacity per unit | : | 2150 Kw |
Efficiency | : | 90% |
|
||
Type | : | Electro-hydraulic |
Adjustment for Speed Drop | : | Between 0 and 10% with accuracy not above 0.5% |
|
||
Type | : | Synchronous AC 3 phase, Horizontal shaft |
Rated Output Capacity per Unit | : | 2353 KVA |
Efficiency | : | 96% |
|
||
Type | : | Oil immersed self-cooled outdoor type |
Rated Capacity | : | 2500 kVA |
Voltage Ratio | : | 33 kV / 6.6 kV |
Efficiency | : | 99% |
|
||
Voltage Level | : | 33 kV |
Length | : | 2.50 km |
To | : | Existing Chhandi Khola SHP Switchyard |